Intent – To eliminate or minimise the risks of fatalities, injuries and events arising from transport tasks (Logistics) at Laing O’Rourke worksites.

Critical Controls

  • CoR Risk Assessment conducted and included in Project or Supply Chain Project Risk Assessment
  • CoR Safe Systems of Work developed and implemented (e.g. Plans, Procedures, SWMS, Work Instructions – Site or Supply Chain developed)
  • Assurance and reporting activities are implemented and monitored
  • Roles and responsibilities are defined and communicated
  • Training needs analysed and training conducted
  • CoR requirements communicated
  • Vehicles speeds are monitored and reviewed for compliance
  • Operators fatigue is being managed (over 11 seats including driver or > greater than 12 T) consistent with the site fatigue management requirements.
  • Load mass and dimensions within vehicles combination limits
  • Load restraint is effective and adequate for the load being transported. Minimum compliance 2018 National Transport Commission Load Restraint-(NTC LR) Guide.
  • Vehicles are road worthy (defect free and maintenance current)

For all supporting documentation please refer to PS Chain of Responsibility 

Stuck? Ask Us For Help.

For more info check out or support page, or contact a member of our team, we’re happy to assist.