Intent – To eliminate or minimise the risks of fatalities, injuries and events arising from the use of cranes and lifting equipment

Critical Controls

  • A Crane Appointed Person is in place 
  • A Crane Supervisor is appointed 
  •  Crane Lift Plan in place 
  • Temporary works, stability and ground bearing pressure are verified for crane use (including suspended slabs / floors) 
  • Coordination arrangements are in place to effectively manage multiple crane operations. 
  • Cranes and lifting equipment inspected and certified before mobilisation and use 
  • Soft slings are not used 
  • Personnel involved in lifting operations are trained and competent 
  • Lifting operations are effectively planned and managed 
  • Plant is operated in a safe manner 
  • Lifting gear is certified and fit for use 
  • A tower crane anti-collision system is operational where there is radius overlap