Intent – To eliminate or minimise the risks of fatalities, injuries and events arising from onsite electrical installations and the use of electrical equipment

Critical Controls

  • Personnel undertaking electrical work are trained and competent.
  • Temporary electrical works are compliant to Australian Standards
  • Work in and around electrical infrastructure is effectively managed.
  • Current electrical drawings and electrical system data are readily available
  • Unless tested for dead, all wires and equipment are to be considered and treated as live.
  • All circuits and powered equipment have RCD protection.
  • Switchboards are compliant and secured.
  • All energy sources are clearly identified and marked.
  • Live cabling is protected from mechanical damage.
  • Generators and welders are correctly earthed and staked as per the OEM manual

All supporting documents refer to PS General Electrical Safety 

Stuck? Ask Us For Help.

For more info check out or support page, or contact a member of our team, we’re happy to assist.