Intent – To eliminate or minimise the risks of fatalities, injuries and events arising from erecting, altering, dismantling and using scaffolding

Critical Controls

  • Temporary works associated with scaffolding is effectively managed
  • Scaffolding is erected / altered / dismantled by trained and competent (and licensed where
    required) personnel
  • Scaffold components have been inspected prior to use
  • Engineer certified design drawings are available for scaffolding with risk of fall over 4 metres
    in height or of a complex nature
  • Protection in place around scaffolding structures
  • Incomplete scaffold is controlled and entry prohibited
  • Controls in place to manage dropped objects
  • Formal recorded periodic inspections are carried out by certified scaffolders or qualified
    persons
  • All required guardrails are in place during erection and dismantling in accordance with a 1m
    lift requirement

All supporting documents refer to PS Scaffolding 