Intent – To eliminate or minimise the risks of fatalities, injuries and events arising from the interaction of plant, equipment, vehicles and people.

Critical Controls

  • Temporary works, stability and ground bearing pressure are verified for plant set up operation and completed access routes for heavy plant and materials.
  • Plant is inspected before mobilisation and before use.
  • Operators are verified as competent for the specific item of plant.
  • Plant and people are separated, defined exclusion zones are maintained, and entry to work areas is controlled.
  • Safe access for pedestrian movements.
  • A Vehicle Movement Plan or equivalent is in place.
  • Heavy vehicles and light vehicles are segregated wherever possible.
  • Rules are established and enacted for plant following plant or overtaking manoeuvres.
  • Dedicated refuelling and servicing rules and locations are established

    For all supporting documentation please refer to PS Plant and Equipment 

     

    Stuck? Ask Us For Help.

    For more info check out or support page, or contact a member of our team, we’re happy to assist.